Sep 22, 2014
Casino Long Xin - installation just finished
Luxury Casino, Design, production, delivery and installation - A-MDM Shanghai
Sep 15, 2014
Casino Long Xin - installation of lights, carpet, sanitary, VIP room
The Casino installation, last phase - floor, carpet waiting to roll out, it should lay down 6 days before final assembly done
Sep 3, 2014
Casino Long Xin - installation of the Pre-Craft elements
Pre-Crafted elements shipped and installation begins. Wall paneling already installed, ceiling lamps waiting for assembling
Aug 22, 2014
Casino Long Xin - early construction phase, demolishing
Casino demolishing - early construction phase
Jun 3, 2014
Casino Long Xin - Prefab Production
Interior Prefabrication Began!